Pipes, Wire and Gravel

The place was a swarm of activity this past week. The back wall of the store was painted to ensure we don’t get water leaking into the building.
Waterproofing
The plumber, Bruce Wellman, was on site to start run the water lines to the new store building and Kaps Krew Electric was there to run the electrical lines to the new store building. All of which needs to go through the foundation.
Electric going in
Once the plumbing and electric lines had been run, and we installed drains around the foundation for water run off, Fred Fields started the work of bringing the ground back up to grade and filling gravel in the center in preparation for the floor to be poured.
Filling with gravel

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s